BENEFITS OF CHOOSING IREV FOR ROOFTOP SOLAR UNDER PPA
IREV offers turnkey rooftop solar power solutions for industrial factories at no cost to the customer through a PPA model. With a team of top experts and engineers from Japan and Vietnam, we are committed to providing our clients with the best benefits when partnering with IREV for rooftop solar installations.
POWER PURCHASEMENT AGREEMENT MODEL (PPA)
The Power Purchase Agreement (PPA) model offered by I-REV is a smart and cost-effective solution for businesses looking to adopt renewable energy. In this model, I-REV handles all the investment and development needed to set up rooftop solar power systems on factory buildings.
Once the system is up and running, the factory owners can purchase the clean electricity generated by these solar panels at a discounted rate. This setup allows businesses to enjoy the benefits of solar power without the upfront costs, making it easier to switch to sustainable energy.
By choosing I-REV’s PPA model, businesses not only reduce their electricity bills but also contribute to environmental sustainability. The solar power systems provide a consistent and reliable source of green energy, helping companies reduce their carbon footprint.
Additionally, this model aligns with long-term economic goals by providing predictable and lower energy costs. With I-REV handling the installation and maintenance, businesses can focus on their core operations while benefiting from renewable energy.
This makes the transition to solar power seamless and advantageous for industrial enterprises.
OUR PROPOSED PROCESS FOR DEVELOPING SOLAR SYSTEM
1 Week
- First, conduct an initial meeting to gather necessary data.
- Then prepare and present the initial proposal based on the collected data and assessments.
2 Weeks
3. Conduct a site survey with the our contractor.
4. Then prepare and present the second proposal.
1 Month
5. Conduct a site visit with structural consultant and credit check.
6. Then prepare a third proposal if reinforcement is needed.
1.5 Months
7. Negotiate and approve PPA contract.
3 Months
8. Construction drawings – Detailed solution.
9. Applying Government permits & licenses.
3 Months
10. Construction.
11. Commercial operational date (COD).
12. Operation and Maintenance (during project life).